RIO CAGUITAS GREENWAY (PHASE 3 & 4) BOARDWALK & PEDESTRIAN BRIDGE OVER CAGUITAS RIVER
BRIDGE_CAGUITAS_1 BRIDGE_CAGUITAS_2 BRIDGE_CAGUITAS_3 BRIDGE_CAGUITAS_4 BRIDGE_CAGUITAS_5
RIO CAGUITAS GREENWAY (PHASE 3 & 4) BOARDWALK & PEDESTRIAN BRIDGE OVER CAGUITAS RIVER

Project Type

PEDESTRIAN BRIDGE & BOARDWALK

Project Scope

New Construction

Project Address

State Road PR-1 to
Luis Muñoz Marin Avenue,
Caguas, PR

Owner

Municipality of Caguas

Year Built

2006

Construction Cost

$2,768,494.14

In Phase 3 of the Rio Caguitas Greenway the project included the design of a boardwalk that borders the river and allows the public to enjoy the natural surroundings.  In Phase 4 a new pedestrian bridge that crosses the Caguitas River was designed.  The bridge is a steel structure with a wood deck floor.

Share this product